MTA-EN-011: Difference between revisions

From Plant Modernization Toolbox
Jump to navigation Jump to search
 
(Revision 0 Reviewed by Monica Hurley)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{DISPLAYTITLE:Reduce Scope of Tendon Surveillance Program for Containment Structures using Sensors - MTA-EN-011}}
{{DISPLAYTITLE:Reduce Scope of Tendon Surveillance Program for Containment Structures using Sensors - MTA-EN-011}}
[[Modernization_Technology_Assessment| Return to MTA Table]]
{{MTATemplate||
{{MTATemplate||
| Date |12/14/2021  
| Date |12/14/2021  
Line 5: Line 6:
Maintenance  
Maintenance  
| Reference Implementation Guidance | Supplemental Report on Containment Tendon Monitoring and on Containment Internal Temperature Monitoring at the R. E. Ginna Nuclear Power Plant (EPRI [https://www.epri.com/research/products/3002002996 3002002996])  
| Reference Implementation Guidance | Supplemental Report on Containment Tendon Monitoring and on Containment Internal Temperature Monitoring at the R. E. Ginna Nuclear Power Plant (EPRI [https://www.epri.com/research/products/3002002996 3002002996])  
| Industry SME | EPRI – Samuel Johnson 
| Industry SME | EPRI Nondestructive Evaluation Program
Contact: NuclearPlantMod@epri.com  
Contact: NuclearPlantMod@epri.com  
| Previous Implementation | Please contact EPRI for more information.  
| Previous Implementation | Please contact EPRI for more information.  
| Implementation Enablers | Not applicable  
| Implementation Enablers | Not applicable  
| SWEEP Score |
* Cost – Level 3 – Implementation cost is less than $1 million. Implementation costs vary depending on the number of sensors installed, but generally the implementation cost is $10k‑15k per tendon.
* Savings – Level 1 – Savings are less than $1 million, per site.
* Payback – Level 1 – Payback period greater than five years.
* Technical Readiness – Level 3 – The technology is commercially available and is ready for wide operational deployment.
* Licensing Readiness – Level 3 – No changes are required for implementation.
* Implementation Proficiency – Level 3 – The technology can be implemented by all sites, regardless of digital experience.
| Applicability | Reactors with post‑tensioned containments   
| Applicability | Reactors with post‑tensioned containments   
All geographic regions  
All geographic regions  
Line 45: Line 39:
** Use of this technology to extend the surveillance frequency may have a positive business case.  
** Use of this technology to extend the surveillance frequency may have a positive business case.  
** Use of this technology to reduce inspection scope may not provide a positive business case due to high initial investment (relative to estimated savings).
** Use of this technology to reduce inspection scope may not provide a positive business case due to high initial investment (relative to estimated savings).
==SWEEP Score==
{| class="wikitable" style="vertical-align:bottom;"
|-
! Category
! Level
! Description
|-
| Cost
| 3
| Implementation cost is less than $1 million. Implementation costs vary  depending on the number of sensors installed, but generally the  implementation cost is $10k‑15k per tendon.
|-
| Savings
| 1
| Savings are less than $1 million, per site.
|-
| Payback
| 1
| Payback period greater than five years.
|-
| Licensing Readiness
| 3
| The technology is commercially available and is ready for wide  operational deployment.
|-
| Technology Readiness
| 3
| No changes are required for implementation.
|-
| Implementation Proficiency
| 3
| The technology can be implemented by all sites, regardless of digital  experience.
|}

Latest revision as of 17:57, 16 March 2026

Return to MTA Table

Administrative Items
Date 12/14/2021
Functional Area Where Benefits Will Be Realized Engineering

Maintenance

Reference Implementation Guidance Supplemental Report on Containment Tendon Monitoring and on Containment Internal Temperature Monitoring at the R. E. Ginna Nuclear Power Plant (EPRI 3002002996)
Industry SME EPRI Nondestructive Evaluation Program

Contact: NuclearPlantMod@epri.com

Previous Implementation Please contact EPRI for more information.
Implementation Enablers Not applicable
Applicability Reactors with post‑tensioned containments

All geographic regions

Keywords Post‑Tensioned Tendons; Tendon Surveillance; Tendon Anchor; Surveillance Extension; NDE
Business Case Analysis Cross-Reference Plant Modernization Business Case: Sensors for Post‑Tensioned Tendons (EPRI 3002021026).

Description

Tendon anchors in containment structures are required to be surveilled to meet American Society of Mechanical Engineers (ASME) Boiler Pressure Vessel Code, Section XI. The examinations include visual inspections of tendon anchorage areas, tendon lift-off test, grease sampling and replacement, and wire extraction for destructive testing. These tests and inspections require large, heavy equipment, high-elevation access, and multiple personnel. Fiber-optic strain gauges can be installed on the tendon anchor head or shims to continuously monitor the prestressing force in the tendon, which could eliminate the need to periodically perform lift-off tests after the sensors are installed. The use of these tendon sensors could (1) reduce the scope of the tendon surveillance program, (2) reduce personnel safety risk by eliminating the need to perform liftoff testing and wire-pulling, and (3) provide the technical basis for extending the surveillance frequency. Typical service life for the sensors is approximately 20 years.

Benefits

Benefits Estimate

Level 1 – Savings are less than $1 million per year, per site. Expected annual savings are in the range of $50,000 ‑ $100,000.

Benefits Description

  • Increase the interval between tendon surveillance inspections and/or reduce inspection scope resulting in labor and contractor cost reductions as well as reduced risks to personnel safety during tests.
  • Allows sites without adequate past performance for the tendon surveillance extension to justify approval of relief request.
  • No License Amendment Request is required as this is a “minor modification”.

Costs and Schedule

Cost

Level 3 – Implementation cost is less than $1 million. Implementation costs vary depending on the number of sensors installed, but the EPRI business case analysis indicated that the implementation costs are $10k‑15k per tendon. All‑in costs, which would include the lift‑off testing, are approximately $60,000 per tendon.

Schedule

Less than six months. Typical installation time is four hours per tendon. Installation of the sensors occurs during normal lift‑off tests. However, depending on the number of tendons instrumented, up to two outage cycles may be needed for complete installation.

Scope Context

Per site. The costs and benefits are evaluated for one plant at a utility. These values will depend on the number of tendons instrumented, which is up to each utility to determine.

Risks

  • The potential for savings is heavily dependent on each utility’s situation (e.g., number of tendons instrumented, approved relief requests, internal versus contracted labor, remaining plant life, etc.).
    • Use of this technology to extend the surveillance frequency may have a positive business case.
    • Use of this technology to reduce inspection scope may not provide a positive business case due to high initial investment (relative to estimated savings).

SWEEP Score

Category Level Description
Cost 3 Implementation cost is less than $1 million. Implementation costs vary depending on the number of sensors installed, but generally the implementation cost is $10k‑15k per tendon.
Savings 1 Savings are less than $1 million, per site.
Payback 1 Payback period greater than five years.
Licensing Readiness 3 The technology is commercially available and is ready for wide operational deployment.
Technology Readiness 3 No changes are required for implementation.
Implementation Proficiency 3 The technology can be implemented by all sites, regardless of digital experience.