MTA-MA-002: Difference between revisions
No edit summary |
Colton Smith (talk | contribs) (Revision 0 Reviewed by Monica Hurley) |
||
| (One intermediate revision by one other user not shown) | |||
| Line 1: | Line 1: | ||
{{DISPLAYTITLE:Reduce Motor Maintenance Costs Through On-Line Monitoring - MTA-MA-002}} | {{DISPLAYTITLE:Reduce Motor Maintenance Costs Through On-Line Monitoring - MTA-MA-002}} | ||
[[Modernization_Technology_Assessment| Return to MTA Table]] | |||
{{MTATemplate|| | {{MTATemplate|| | ||
| Date |12/15/2020 | | Date |12/15/2020 | ||
| Line 6: | Line 7: | ||
Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance (EPRI [https://www.epri.com/research/products/3002012784 3002012784]) | Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance (EPRI [https://www.epri.com/research/products/3002012784 3002012784]) | ||
[https://pmbd.epri.com/ EPRI Preventive Maintenance Basis Database (PMBD)] | |||
Wireless Sensor Survey and General Specification (EPRI [https://www.epri.com/research/products/3002011818 3002011818]) | Wireless Sensor Survey and General Specification (EPRI [https://www.epri.com/research/products/3002011818 3002011818]) | ||
| Line 16: | Line 15: | ||
COLM Quick Guide – Vertical Motors (EPRI [https://www.epri.com/research/products/3002012765 3002012765], [https://www.epri.com/research/products/3002012781 3002012781]) | COLM Quick Guide – Vertical Motors (EPRI [https://www.epri.com/research/products/3002012765 3002012765], [https://www.epri.com/research/products/3002012781 3002012781]) | ||
| Industry SME | | | Industry SME | | ||
EPRI PRR | |||
Contact: NuclearPlantMod@epri.com | Contact: NuclearPlantMod@epri.com | ||
| Previous Implementation | Please contact EPRI for implementation examples and contacts. | | Previous Implementation | Please contact EPRI for implementation examples and contacts. | ||
| Implementation Enablers | Wireless Communications; Accessible Locations | | Implementation Enablers | Wireless Communications; Accessible Locations | ||
| Applicability | All Reactor Types | | Applicability | All Reactor Types | ||
All Regions | All Regions | ||
| Line 59: | Line 49: | ||
==Risks== | ==Risks== | ||
IT risks: If the IT interfaces with the new sensors are not considered, then there could be schedule delays in getting the sensors installed. Addressing IT concerns at the requirements phase of the project (e.g., how the sensor data will be gathered and used) will mitigate this risk. | IT risks: If the IT interfaces with the new sensors are not considered, then there could be schedule delays in getting the sensors installed. Addressing IT concerns at the requirements phase of the project (e.g., how the sensor data will be gathered and used) will mitigate this risk. | ||
==SWEEP Score== | |||
{| class="wikitable" style="vertical-align:bottom;" | |||
|- | |||
! Category | |||
! Level | |||
! Description | |||
|- | |||
| Cost | |||
| 3 | |||
| Implementation cost is less than USD 1M | |||
|- | |||
| Savings | |||
| 1 | |||
| Savings are less than USD 1M per year | |||
|- | |||
| Payback | |||
| 2 | |||
| Payback period is greater than one year but less than 5 years | |||
|- | |||
| Licensing Readiness | |||
| 3 | |||
| No changes are required | |||
|- | |||
| Technology Readiness | |||
| 3 | |||
| The technology is ready for wide operational deployment. Advanced OLM has already been implemented at fossil facilities and piloted at nuclear facilities. | |||
|- | |||
| Implementation Proficiency | |||
| 3 | |||
| The technology can be implemented by all sites regardless of digital experience. Implementing an advanced OLM program should not require a design change. | |||
|} | |||
Latest revision as of 13:47, 20 March 2026
| Administrative Items | |
|---|---|
| Date | 12/15/2020 |
| Functional Area Where Benefits Will Be Realized | Maintenance |
| Reference Implementation Guidance |
Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance (EPRI 3002012784) EPRI Preventive Maintenance Basis Database (PMBD) Wireless Sensor Survey and General Specification (EPRI 3002011818) COLM Quick Guide – Horizontal Motors (EPRI 3002012766) COLM Quick Guide – Vertical Motors (EPRI 3002012765, 3002012781) |
| Industry SME |
EPRI PRR Contact: NuclearPlantMod@epri.com |
| Previous Implementation | Please contact EPRI for implementation examples and contacts. |
| Implementation Enablers | Wireless Communications; Accessible Locations |
| Applicability | All Reactor Types
All Regions |
| Keywords | Condition-based maintenance; Equipment reliability; On-line monitoring; Motors; Sensors |
| Business Case Analysis Cross-Reference | N/A |
Description
Nuclear utilities use a variety of motors for essential site operations. As with all mechanical components and sub‑components, these components require routine inspection and maintenance. Historically these inspections and maintenance have been performed periodically on a time and material basis. Technology advances in sensors, wireless communications, and data analysis now enable continuous monitoring and trending of various component parameters. Broadly referred to as Continuous On‑line Monitoring (COLM), this MQG applies more specifically to the monitoring of motor components and the associated maintenance tasks that can be eliminated or conducted less frequently.
Benefits
Benefits Estimate
Level 1 – Savings are less than USD 1M per year
Benefits Description
- Labor savings for some eliminated Preventive Maintenance (PM) tasks and for interval extension for other PM tasks
- Early detection of equipment degradation resulting in reduced equipment forced outages and corrective maintenance (CM) costs and a transition from periodic maintenance to condition‑based maintenance
- Improved PM/CM KPI performance
- Improved visibility to asset or system condition through more frequent data collection
- Reduction of potential rework for inaccurate maintenance (avoided costs)
Costs and Schedule
Cost
Level 3 – Implementation cost is less than USD 1M
Schedule
Less than 6 months
Scope Context
Component / System – The scope of the cost and benefit estimates assumes 4‑5 motors per unit. Results for multi‑unit sites or across a fleet should be scaled, accounting for any potential efficiencies in larger deployments
Risks
IT risks: If the IT interfaces with the new sensors are not considered, then there could be schedule delays in getting the sensors installed. Addressing IT concerns at the requirements phase of the project (e.g., how the sensor data will be gathered and used) will mitigate this risk.
SWEEP Score
| Category | Level | Description |
|---|---|---|
| Cost | 3 | Implementation cost is less than USD 1M |
| Savings | 1 | Savings are less than USD 1M per year |
| Payback | 2 | Payback period is greater than one year but less than 5 years |
| Licensing Readiness | 3 | No changes are required |
| Technology Readiness | 3 | The technology is ready for wide operational deployment. Advanced OLM has already been implemented at fossil facilities and piloted at nuclear facilities. |
| Implementation Proficiency | 3 | The technology can be implemented by all sites regardless of digital experience. Implementing an advanced OLM program should not require a design change. |