MTA-RP-001: Difference between revisions
(Created page with "{{DISPLAYTITLE:Risk-informed Condition Based Radiological Surveys Using Remote Radiation Monitoring Technologies - MTA-RP-001}} {{MTATemplate|| | Date |12/15/2020 | Functional Area Where Benefits Will Be Realized | Radiation Protection Operations Engineering | Reference Implementation Guidance | Application of Remote Monitoring Technologies to Risk-Inform Condition Based Radiological Surveys (EPRI [https://www.epri.com/research/products/3002016346 3002016346]) | I...") |
Jacob Sommer (talk | contribs) m (1 revision imported) |
(No difference)
| |
Revision as of 01:37, 5 March 2026
| Administrative Items | |
|---|---|
| Date | 12/15/2020 |
| Functional Area Where Benefits Will Be Realized | Radiation Protection
Operations Engineering |
| Reference Implementation Guidance | Application of Remote Monitoring Technologies to Risk-Inform Condition Based Radiological Surveys (EPRI 3002016346) |
| Industry SME | EPRI – Karen Kim-Stevens
Contact: NuclearPlantMod@epri.com |
| Previous Implementation | Please contact EPRI for implementation examples and contacts. |
| Implementation Enablers |
|
| SWEEP Score |
|
| Applicability | All reactor types
All geographic regions |
| Keywords | Radiological survey; Radiation survey; Remote Monitoring Technology (RMT); Radiation RMT |
| Business Case Analysis Cross-Reference | N/A |
Description
Nuclear power plants conduct routine, manual radiation surveys throughout the plant to inform workers of radiological conditions. These surveys help inform decision making and support radiation protection actions. Commercially available Radiation Remote Monitoring Technologies (RMT) can measure radiation dose rates and transmit the data to a database. The data can be viewed in real‑time to inform plant personnel of the radiological conditions and trended over time to inform radiation protection operations.
Radiation RMT networks can be used to conduct risk‑informed or condition‑based manual radiological surveys. In other words, manual surveys can be performed when the radiation RMT indicate that they may be needed instead of on a routine, schedule‑based frequency. In this way, costs associated with conducting manual surveys can be reduced. Using this strategy could provide more frequent data regarding radiological conditions, which can be used to enhance ALARA and radiation protection.
Benefits
Benefits Estimate
Level 1 – Savings associated with time saved from conducting manual radiological surveys is less than $1 million per year.
Benefits Description
- Reduction of staff hours required to perform manual surveys.
- Increased frequency of data to inform decision making and detect changes to reduce radiation exposures of workers.
- Increased efficiency of ALARA planning for outages.
- Increased ability to understand and predict changes in normal plant operations using real‑time radiological data from the radiation RMT network.
- Reduced radiation exposure due to reduced entries into radiation areas.
Costs and Schedule
Cost
Level 2 – Implementation cost to procure equipment and develop an RMT program is typically greater than $1 million but less than $5 million.
Schedule
Complete program development could be accomplished in 6 to 12 months.
Scope Context
Site‑wide
Risks
Experience with radiation RMT has shown that additional effort may be required for adjustments in the implementation procedures to eliminate or address spurious indications of out‑of‑specification radiation levels. These indications may be from normal instrument variation or sensitivity due to very low radiation source term in some areas. These risks will decrease as industry experience with radiation RMT increases and best practices are developed.
Automation of surveys can increase workload on plant personnel related to instrumentation calibration and source checks, particularly during the early stages of implementation while baseline data are collected. To mitigate this risk, efficient strategies for calibration and source checking instrumentation will need to be developed during implementation.