Business Case Analysis Models

From Plant Modernization Toolbox
Revision as of 17:01, 16 February 2026 by en>Admin
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Download ↓
PMTB Business Cases
Functional Area Description Product # NPV Primary Areas for Savings Publish Date Related MTA Notes
Multiple Plant Modernization Business Case: Consolidated Business Case Evaluation for Nuclear Power Plants 3002025401 $$$$$ Plant Efficiency Benefits & Annual Avoided Direct Labor 03/15/2023 Multiple Business case based on consolidation of BCAMs completed prior to 2023.
Operations Plant Modernization Business Case: Improved Thermal Performance Through Data Validation and Reconciliation (DVR) 3002019845 $$$$$ Plant Efficiency Benefits 11/30/2020 MTA-EN-006
Maintenance Plant Modernization Business Case: Digital Safety-Related Instrumentation and Control (I&C) System Modernizations 3002020579 $$$$$ Annual Avoided Direct Labor Costs / Periodic Avoided Outage Costs (Contract Services) / Annual Avoided Material Costs 04/02/2021 MTA-EN-009
Maintenance Plant Modernization Business Case: Digital Safety and Non-Safety-Related Instrumentation and Control (I&C) System Modernizations: Cost-Benefit Analysis of Implementing Digital Upgrades to Analog Safety and Non-Safety- Related I&C Components 3002029090 $$$$$ Annual Avoided Online Costs (Avoided Outage & Derates) /Annual Avoided Direct Labor Costs / Periodic Avoided Outage Costs (Contract Services) / Annual Avoided Material Costs 09/20/2024
Maintenance / Work Management Nuclear Plant Modernization: Business Process Automation for Online Work Management 3002020884 $$$$$ Annual Avoided Material Costs / Annual Avoided Direct Labor Costs 11/17/2021 N/A
Work Management Plant Modernization Business Case Analysis: Electronic Work Packages (eWP) for Maintenance Work 3002019843 $$$$ Annual Avoided Direct Labor Costs 11/23/2020 MTA-WM-001
Operations Plant Modernization Business Case: Improved Thermal Performance Through Cycle Isolation 3002019844 $$$$ Plant Efficiency Benefits 11/25/2020 MTA-EN-007
Training Plant Modernization Business Case: Industry Delivered Initial Technical Training 3002020886 $$$$ Annual Avoided Direct Labor Costs 11/17/2021 N/A
Maintenance Plant Modernization Business Case – Monitoring and Diagnostic Program Development: Cost-Benefit Analysis of Implementing Online Monitoring (OLM) and a Monitoring and Diagnostic Program Using Advanced Pattern Recognition (APR) Software 3002028178 $$$ Annual Avoided Online Costs (Avoided Outage & Derates/Insurance Premiums/ Contractor Costs) / Periodic Avoided Outage Costs (Contract Services) 03/01/2024 N/A Evaluates entire costs of setting up a new M&D program, and defering refurbishment PMs
Engineering Plant Modernization Business Case: Use of a Risk-Informed Inspection Process to Reduce Labor and Contract Costs 3002020582 $$$ Periodic Avoided Outage Costs (Contract Services) 04/07/2021 MTA-MA-027
Maintenance Plant Modernization Business Case: Use of Hydrophobic Coatings to Reduce Maintenance Costs 3002018426 $$$ Investment Deferral Benefit / Annual Avoided Online Costs (Contractor Services) 11/05/2020 MTA-MA-026
Maintenance Plant Modernization Business Case: Use of Risk-Informed Methods to Reduce Main Turbine Maintenance and Testing 3002020580 $$ Periodic Avoided Outage Costs (Contract Services) / Plant Efficiency Benefits 04/08/2021 MTA-MA-025
Maintenance Plant Modernization Business Case: Monitoring and Diagnostics (M&D) Program Development Update 3002020885 $$ Annual Avoided Online Costs (Avoided Outage & Derates/Insurance Premiums/ Contractor Costs) 11/18/2021 N/A Supports 3002018424. This BCAM focused on incremental evaluation of components rather than entire M&D program
Engineering Plant Modernization Business Case: Monitoring Piping Subjected to Flow-Accelerated Corrosion 3002018480 $ Periodic Avoided Outage Costs (Contract Services) 06/30/2020 MTA-EN-008
Maintenance Plant Modernization Business Case: Drone Inspections of Containment Structures 3002021027 $ Annual Avoided Contractor Costs 04/30/2021 MTA-MA-021
Engineering Plant Modernization Business Case: Sensors for Post-Tensioned Tendons 3002021026 $ Periodic Avoided Outage Costs (Contract Services) 04/30/2021 MTA-EN-011
Training Plant Modernization Business Case: Cost-Benefit Analysis for Implementation of the EPRI Virtual NDE (VNDE) Ultrasonic Simulator 3002020581 $ Annual Avoided Other-Online Costs (Travel Costs) 04/05/2021 MTA-TR-001
Engineering Plant Modernization Business Case: Monitoring Heat Exchanger Shells 3002018481 $ Periodic Avoided Outage Costs (Contract Services) 06/30/2020 N/A
Engineering Plant Modernization Business Case: Monitoring Service Water Piping 3002018483 $ Periodic Avoided Outage Costs (Contract Services) 06/30/2020 N/A Future R&D to address high costs of sensor installation
Radiation Protection NextGen RP Plant Modernization Business Case: Modernizing Nuclear Power Plant Emergency Response Field Monitoring Team Technologies 3002020974 $ Annual Avoided Direct Labor 10/27/2021 N/A Enabler to optimize RPT staffing and enhance the implementation of FMT at nuclear power plants
Chemistry Plant Modernization Business Case: Automated Chemistry 3002020440 $ Annual Avoided Direct Labor 06/21/2021 N/A Future R&D to address high costs of sensor installation

Notes

Net present value (NPV): the difference between the present value of cash inflows (e.g., savings) and the present value of cash outflows (e.g., costs) over a period of time. NPV is used in capital budgeting and investment planning to analyze the profitability of a projected investment or project. A NPV greater than zero indicates a worthwhile investment.

  • $ = 0-$500K
  • $$ = $500K-$1M
  • $$$ = $1M-$5M
  • $$$$ = $5M-$10M
  • $$$$$ => $10M