Business Case Analysis Models: Difference between revisions
Jump to navigation
Jump to search
Colton Smith (talk | contribs) (Revision 0 Reviewed by Monica Hurley) |
Colton Smith (talk | contribs) (Revision 1) |
||
| (4 intermediate revisions by one other user not shown) | |||
| Line 6: | Line 6: | ||
</html> | </html> | ||
| | | | ||
| class="centertabletd" | [[Media:Business Case Analysis Models.xlsx|Download ↓]] | | class="centertabletd buttontd" | [[Media:Business Case Analysis Models.xlsx|Download ↓]] | ||
|} | |} | ||
| Line 12: | Line 12: | ||
|+ PMTB Business Cases | |+ PMTB Business Cases | ||
|- style="position:sticky; top:0;width:100%;" | | |- style="position:sticky; top:0;width:100%;" | | ||
! width="210px" | Functional Area | ! class="unsortable" width="210px" | Functional Area | ||
! | ! class="unfilterable" style="width:310px;" | Description | ||
! width | ! class="unfilterable" style="width:"105px;" | Product # | ||
! width="58px" | NPV | ! class="unsortable" width="58px" | NPV | ||
! | ! class="unfilterable" style="width:300px;" | Primary Areas for Savings | ||
! | ! class="unfilterable" style="width:58px;" | Publish Date | ||
! | ! class="unfilterable" style="width:100px;" | Related [[Modernization_Technology_Assessment| MTA(s)]] | ||
|- | |||
| Maintenance | |||
| Plant Modernization Business Case: Cost-Benefit Analysis of Calibration Interval Extensions Using OLM and Historical Calibration Methods - A Business Case Evaluation of Condition-Based Strategies in Nuclear Power Plants | |||
| [https://www.epri.com/research/programs/111344/results/3002035082 3002035082] | |||
| $$$ | |||
| Periodic Avoided Outage Direct Labor Costs | |||
| 9/08/2026 | |||
| [[MTA-MA-032| MTA-MA-032]] | |||
|- | |- | ||
| Multiple | | Multiple | ||
| Line 28: | Line 36: | ||
| 03/15/2023 | | 03/15/2023 | ||
| Multiple | | Multiple | ||
|- | |- | ||
| Operations | | Operations | ||
| Line 37: | Line 44: | ||
| 11/30/2020 | | 11/30/2020 | ||
| [[MTA-EN-006-R1| MTA-EN-006-R1]] | | [[MTA-EN-006-R1| MTA-EN-006-R1]] | ||
|- | |- | ||
| Maintenance | | Maintenance | ||
| Line 46: | Line 52: | ||
| 04/02/2021 | | 04/02/2021 | ||
| [[MTA-EN-009| MTA-EN-009]] | | [[MTA-EN-009| MTA-EN-009]] | ||
|- | |- | ||
| Maintenance | | Maintenance | ||
| Line 54: | Line 59: | ||
| Annual Avoided Online Costs (Avoided Outage & Derates) /Annual Avoided Direct Labor Costs / Periodic Avoided Outage Costs (Contract Services) / Annual Avoided Material Costs | | Annual Avoided Online Costs (Avoided Outage & Derates) /Annual Avoided Direct Labor Costs / Periodic Avoided Outage Costs (Contract Services) / Annual Avoided Material Costs | ||
| 09/20/2024 | | 09/20/2024 | ||
| | | [[MTA-EN-009| MTA-EN-009]] | ||
| | |||
|- | |- | ||
| Maintenance / Work Management | | Maintenance / Work Management | ||
| Line 64: | Line 68: | ||
| 11/17/2021 | | 11/17/2021 | ||
| N/A | | N/A | ||
|- | |- | ||
| Work Management | | Work Management | ||
| Line 73: | Line 76: | ||
| 11/23/2020 | | 11/23/2020 | ||
| [[MTA-WM-001| MTA-WM-001]] | | [[MTA-WM-001| MTA-WM-001]] | ||
|- | |- | ||
| Operations | | Operations | ||
| Line 82: | Line 84: | ||
| 11/25/2020 | | 11/25/2020 | ||
| [[MTA-EN-007| MTA-EN-007]] | | [[MTA-EN-007| MTA-EN-007]] | ||
|- | |- | ||
| Training | | Training | ||
| Line 91: | Line 92: | ||
| 11/17/2021 | | 11/17/2021 | ||
| N/A | | N/A | ||
|- | |- | ||
| Maintenance | | Maintenance | ||
| Line 99: | Line 99: | ||
| Annual Avoided Online Costs (Avoided Outage & Derates/Insurance Premiums/ Contractor Costs) / Periodic Avoided Outage Costs (Contract Services) | | Annual Avoided Online Costs (Avoided Outage & Derates/Insurance Premiums/ Contractor Costs) / Periodic Avoided Outage Costs (Contract Services) | ||
| 03/01/2024 | | 03/01/2024 | ||
| | |[[MTA-MA-002|MTA-MA-002]]<br/>[[MTA-MA-008|MTA-MA-008]]<br/>[[MTA-MA-009|MTA-MA-009]]<br/>[[MTA-MA-010|MTA-MA-010]]<br/>[[MTA-MA-024|MTA-MA-024]] | ||
| | |||
|- | |- | ||
| Engineering | | Engineering | ||
| Line 109: | Line 108: | ||
| 04/07/2021 | | 04/07/2021 | ||
| [[MTA-MA-027| MTA-MA-027]] | | [[MTA-MA-027| MTA-MA-027]] | ||
|- | |- | ||
| Maintenance | | Maintenance | ||
| Line 118: | Line 116: | ||
| 11/05/2020 | | 11/05/2020 | ||
| [[MTA-MA-026| MTA-MA-026]] | | [[MTA-MA-026| MTA-MA-026]] | ||
|- | |- | ||
| Maintenance | | Maintenance | ||
| Line 127: | Line 124: | ||
| 04/08/2021 | | 04/08/2021 | ||
| [[MTA-MA-025| MTA-MA-025]] | | [[MTA-MA-025| MTA-MA-025]] | ||
|- | |- | ||
| Maintenance | | Maintenance | ||
| Line 136: | Line 132: | ||
| 11/18/2021 | | 11/18/2021 | ||
| N/A | | N/A | ||
|- | |- | ||
| Engineering | | Engineering | ||
| Line 145: | Line 140: | ||
| 06/30/2020 | | 06/30/2020 | ||
| [[MTA-EN-008| MTA-EN-008]] | | [[MTA-EN-008| MTA-EN-008]] | ||
|- | |- | ||
| Maintenance | | Maintenance | ||
| Line 154: | Line 148: | ||
| 04/30/2021 | | 04/30/2021 | ||
| [[MTA-MA-021-R1| MTA-MA-021-R1]] | | [[MTA-MA-021-R1| MTA-MA-021-R1]] | ||
|- | |- | ||
| Engineering | | Engineering | ||
| Line 163: | Line 156: | ||
| 04/30/2021 | | 04/30/2021 | ||
| [[MTA-EN-011| MTA-EN-011]] | | [[MTA-EN-011| MTA-EN-011]] | ||
|- | |- | ||
| Training | | Training | ||
| Line 172: | Line 164: | ||
| 04/05/2021 | | 04/05/2021 | ||
| [[MTA-TR-001| MTA-TR-001]] | | [[MTA-TR-001| MTA-TR-001]] | ||
|- | |- | ||
| Engineering | | Engineering | ||
| Line 181: | Line 172: | ||
| 06/30/2020 | | 06/30/2020 | ||
| N/A | | N/A | ||
|- | |- | ||
| Engineering | | Engineering | ||
| Line 190: | Line 180: | ||
| 06/30/2020 | | 06/30/2020 | ||
| N/A | | N/A | ||
|- | |- | ||
| Radiation Protection | | Radiation Protection | ||
| Line 199: | Line 188: | ||
| 10/27/2021 | | 10/27/2021 | ||
| N/A | | N/A | ||
|- | |- | ||
| Chemistry | | Chemistry | ||
| Line 208: | Line 196: | ||
| 06/21/2021 | | 06/21/2021 | ||
| N/A | | N/A | ||
|} | |} | ||
Latest revision as of 15:14, 5 October 2026
This table can be searched by topic using the “Filter by text” field and sorted by net present value (NPV) by selecting the appropriate column header. The table may also be exported to an Excel spreadsheet for internal use by selecting "Download" below.
| Download ↓ |
| Functional Area | Description | Product # | NPV | Primary Areas for Savings | Publish Date | Related MTA(s) |
|---|---|---|---|---|---|---|
| Maintenance | Plant Modernization Business Case: Cost-Benefit Analysis of Calibration Interval Extensions Using OLM and Historical Calibration Methods - A Business Case Evaluation of Condition-Based Strategies in Nuclear Power Plants | 3002035082 | $$$ | Periodic Avoided Outage Direct Labor Costs | 9/08/2026 | MTA-MA-032 |
| Multiple | Plant Modernization Business Case: Consolidated Business Case Evaluation for Nuclear Power Plants | 3002025401 | $$$$$ | Plant Efficiency Benefits & Annual Avoided Direct Labor | 03/15/2023 | Multiple |
| Operations | Plant Modernization Business Case: Improved Thermal Performance Through Data Validation and Reconciliation (DVR) | 3002019845 | $$$$$ | Plant Efficiency Benefits | 11/30/2020 | MTA-EN-006-R1 |
| Maintenance | Plant Modernization Business Case: Digital Safety-Related Instrumentation and Control (I&C) System Modernizations | 3002020579 | $$$$$ | Annual Avoided Direct Labor Costs / Periodic Avoided Outage Costs (Contract Services) / Annual Avoided Material Costs | 04/02/2021 | MTA-EN-009 |
| Maintenance | Plant Modernization Business Case: Digital Safety and Non-Safety-Related Instrumentation and Control (I&C) System Modernizations: Cost-Benefit Analysis of Implementing Digital Upgrades to Analog Safety and Non-Safety- Related I&C Components | 3002029090 | $$$$$ | Annual Avoided Online Costs (Avoided Outage & Derates) /Annual Avoided Direct Labor Costs / Periodic Avoided Outage Costs (Contract Services) / Annual Avoided Material Costs | 09/20/2024 | MTA-EN-009 |
| Maintenance / Work Management | Nuclear Plant Modernization: Business Process Automation for Online Work Management | 3002020884 | $$$$$ | Annual Avoided Material Costs / Annual Avoided Direct Labor Costs | 11/17/2021 | N/A |
| Work Management | Plant Modernization Business Case Analysis: Electronic Work Packages (eWP) for Maintenance Work | 3002019843 | $$$$ | Annual Avoided Direct Labor Costs | 11/23/2020 | MTA-WM-001 |
| Operations | Plant Modernization Business Case: Improved Thermal Performance Through Cycle Isolation | 3002019844 | $$$$ | Plant Efficiency Benefits | 11/25/2020 | MTA-EN-007 |
| Training | Plant Modernization Business Case: Industry Delivered Initial Technical Training | 3002020886 | $$$$ | Annual Avoided Direct Labor Costs | 11/17/2021 | N/A |
| Maintenance | Plant Modernization Business Case – Monitoring and Diagnostic Program Development: Cost-Benefit Analysis of Implementing Online Monitoring (OLM) and a Monitoring and Diagnostic Program Using Advanced Pattern Recognition (APR) Software | 3002028178 | $$$ | Annual Avoided Online Costs (Avoided Outage & Derates/Insurance Premiums/ Contractor Costs) / Periodic Avoided Outage Costs (Contract Services) | 03/01/2024 | MTA-MA-002 MTA-MA-008 MTA-MA-009 MTA-MA-010 MTA-MA-024 |
| Engineering | Plant Modernization Business Case: Use of a Risk-Informed Inspection Process to Reduce Labor and Contract Costs | 3002020582 | $$$ | Periodic Avoided Outage Costs (Contract Services) | 04/07/2021 | MTA-MA-027 |
| Maintenance | Plant Modernization Business Case: Use of Hydrophobic Coatings to Reduce Maintenance Costs | 3002018426 | $$$ | Investment Deferral Benefit / Annual Avoided Online Costs (Contractor Services) | 11/05/2020 | MTA-MA-026 |
| Maintenance | Plant Modernization Business Case: Use of Risk-Informed Methods to Reduce Main Turbine Maintenance and Testing | 3002020580 | $$ | Periodic Avoided Outage Costs (Contract Services) / Plant Efficiency Benefits | 04/08/2021 | MTA-MA-025 |
| Maintenance | Plant Modernization Business Case: Monitoring and Diagnostics (M&D) Program Development Update | 3002020885 | $$ | Annual Avoided Online Costs (Avoided Outage & Derates/Insurance Premiums/ Contractor Costs) | 11/18/2021 | N/A |
| Engineering | Plant Modernization Business Case: Monitoring Piping Subjected to Flow-Accelerated Corrosion | 3002018480 | $ | Periodic Avoided Outage Costs (Contract Services) | 06/30/2020 | MTA-EN-008 |
| Maintenance | Plant Modernization Business Case: Drone Inspections of Containment Structures | 3002021027 | $ | Annual Avoided Contractor Costs | 04/30/2021 | MTA-MA-021-R1 |
| Engineering | Plant Modernization Business Case: Sensors for Post-Tensioned Tendons | 3002021026 | $ | Periodic Avoided Outage Costs (Contract Services) | 04/30/2021 | MTA-EN-011 |
| Training | Plant Modernization Business Case: Cost-Benefit Analysis for Implementation of the EPRI Virtual NDE (VNDE) Ultrasonic Simulator | 3002020581 | $ | Annual Avoided Other-Online Costs (Travel Costs) | 04/05/2021 | MTA-TR-001 |
| Engineering | Plant Modernization Business Case: Monitoring Heat Exchanger Shells | 3002018481 | $ | Periodic Avoided Outage Costs (Contract Services) | 06/30/2020 | N/A |
| Engineering | Plant Modernization Business Case: Monitoring Service Water Piping | 3002018483 | $ | Periodic Avoided Outage Costs (Contract Services) | 06/30/2020 | N/A |
| Radiation Protection | NextGen RP Plant Modernization Business Case: Modernizing Nuclear Power Plant Emergency Response Field Monitoring Team Technologies | 3002020974 | $ | Annual Avoided Direct Labor | 10/27/2021 | N/A |
| Chemistry | Plant Modernization Business Case: Automated Chemistry | 3002020440 | $ | Annual Avoided Direct Labor | 06/21/2021 | N/A |
Notes
Net present value (NPV): the difference between the present value of cash inflows (e.g., savings) and the present value of cash outflows (e.g., costs) over a period of time. NPV is used in capital budgeting and investment planning to analyze the profitability of a projected investment or project. A NPV greater than zero indicates a worthwhile investment.
- $ = 0-$500K
- $$ = $500K-$1M
- $$$ = $1M-$5M
- $$$$ = $5M-$10M
- $$$$$ => $10M