Modernization Technology Assessment: Difference between revisions

From Plant Modernization Toolbox
Jump to navigation Jump to search
No edit summary
 
No edit summary
 
(9 intermediate revisions by 3 users not shown)
Line 1: Line 1:
__FORCETOC__
__FORCETOC__
==MTA==
==MTA==
Each MTA is publicly available and can be accessed by selecting its MTA number. Users may search the table using the “Filter by text” field, sort MTAs by SWEEP scores and applicability criteria, and export the table to Excel for internal use by selecting download below.
{| class="" style="width:100%"
{| class="" style="width:100%"
|-
|-
Line 6: Line 9:
</html>
</html>
|
|
| class="centertabletd" | [[Media:Modernization Technology Assessments.xlsx|Download ↓]]
| class="centertabletd buttontd" | [[Media:Modernization Technology Assessments.xlsx|Download ↓]]
|}
|}


{| class="wikitable sortable filterable" id="mtaTable"
{| class="wikitable sortable filterable" id="filteredTable"
|- style="position:sticky; top:0;width:100%" |
|- style="position:sticky; top:0;width:100%" |
!  rowspan="2" style="width:100px;" | ID
!  rowspan="2" class="unfilterable" style="width:100px;" | ID
!  rowspan="2" | Functional Area Where Benefits Will Be Realized
!  rowspan="2" class="unsortable" | Functional Area Where Benefits Will Be Realized
!  rowspan="2" | Description
!  rowspan="2" class="unfilterable" | Description
!  colspan="6" style="background-color:#fff9c4;" | SWEEP Score [[#SWEEP_Score|❓]]
!  colspan="6" class="unfilterable" style="background-color:#fff9c4;" | SWEEP Score [[#SWEEP_Score|❓]]
!  rowspan="2" | Applicability
!  rowspan="2" class="unfilterable" | Applicability
!  rowspan="2" | Publish Date
!  rowspan="2" class="unfilterable" | Publish Date
!  rowspan="2" | Applicable BCAM
!  rowspan="2" class="unfilterable" | Applicable BCAM
|- style="position:sticky; top:25px;" |
|- style="position:sticky; top:25px;" |
!  style="background-color:#fffde7;" | Cost
!  style="background-color:#fffde7;" | Cost
Line 51: Line 54:
| 12/14/2021
| 12/14/2021
| [https://www.epri.com/research/products/3002020579 3002020579]
| [https://www.epri.com/research/products/3002020579 3002020579]
|-
| [[MTA-OP-002|MTA-OP-002]]
| Operations
| Improve Efficiencies Using Unmanned Ground Systems for General Plant Use
| Level 3
| Level 1
| Level 2
| Level 3
| Level 3
| Level 3
| All Reactor Types
| 09/30/2023
| N/A
|-
| [[MTA-RP-005|MTA-RP-005]]
| Radiation Protection
| Reduce Dose and Increase Efficiency Using Unmanned Ground Systems for Radiation Protection Tasks
| Level 3
| Level 1
| Level 2
| Level 3
| Level 3
| Level 3
| All Reactor Types
| 09/30/2023
| N/A
|-
|-
| [[MTA-EN-010|MTA-EN-010]]
| [[MTA-EN-010|MTA-EN-010]]
Line 128: Line 157:
| All Reactor Types
| All Reactor Types
| 12/15/2020
| 12/15/2020
| [https://www.epri.com/research/products/3002018424 3002018424]
| [https://www.epri.com/research/products/3002028178 3002028178]
|-
|-
| [[MTA-MA-009|MTA-MA-009]]
| [[MTA-MA-009|MTA-MA-009]]
Line 141: Line 170:
| All Reactor Types
| All Reactor Types
| 12/15/2020
| 12/15/2020
| [https://www.epri.com/research/products/3002018424 3002018424]
| [https://www.epri.com/research/products/3002028178 3002028178]
|-
|-
| [[MTA-MA-010|MTA-MA-010]]
| [[MTA-MA-010|MTA-MA-010]]
Line 154: Line 183:
| All Reactor Types
| All Reactor Types
| 12/15/2020
| 12/15/2020
| [https://www.epri.com/research/products/3002018424 3002018424]
| [https://www.epri.com/research/products/3002028178 3002028178]
|-
|-
| [[MTA-MA-011|MTA-MA-011]]
| [[MTA-MA-011|MTA-MA-011]]
Line 284: Line 313:
| All Reactor Types
| All Reactor Types
| 03/01/2023
| 03/01/2023
| N/A
|-
| [[MTA-MA-021|MTA-MA-021]]
| Maintenance
| Reducing Costs Using Unmanned Aerial Vehicles (UAV) for Containment Inspections
| Level 3
| Level 1
| Level 3
| Level 3
| Level 3
| Level 3
| All Reactor Types
| 12/15/2020
| N/A
| N/A
|-
|-
Line 752: Line 768:
| All Reactor Types
| All Reactor Types
| 04/23/2021
| 04/23/2021
| [https://www.epri.com/research/products/3002018424 3002018424]<br/>[https://www.epri.com/research/products/3002020885 3002020885]
| [https://www.epri.com/research/products/3002028178 3002028178]<br/>[https://www.epri.com/research/products/3002020885 3002020885]
|-
|-
| [[MTA-MA-025|MTA-MA-025]]
| [[MTA-MA-025|MTA-MA-025]]
Line 882: Line 898:
| All Reactor Types
| All Reactor Types
| 12/15/2020
| 12/15/2020
| [https://www.epri.com/research/products/3002018424 3002018424]<br/>[https://www.epri.com/research/products/3002020885 3002020885]
| [https://www.epri.com/research/products/3002028178 3002028178]<br/>[https://www.epri.com/research/products/3002020885 3002020885]
|-
|-
| [[MTA-MA-003|MTA-MA-003]]
| [[MTA-MA-003|MTA-MA-003]]

Latest revision as of 20:58, 19 June 2026

MTA

Each MTA is publicly available and can be accessed by selecting its MTA number. Users may search the table using the “Filter by text” field, sort MTAs by SWEEP scores and applicability criteria, and export the table to Excel for internal use by selecting download below.

Download ↓
ID Functional Area Where Benefits Will Be Realized Description SWEEP Score Applicability Publish Date Applicable BCAM
Cost Savings Payback Licensing Readiness Technology Readiness Implement Proficiency
MTA-EN-003-R1 Engineering Manage Scope of Pre-stressed Concrete Embedded Cylinder Pipe (PCCP) Repairs Using Ultrasonic Inspection Methods Level 3 Level 3 Level 3 Level 3 Level 3 Level 3 All Reactor Types 04/23/2021 N/A
MTA-EN-009 Engineering Digital Safety-Related Instrumentation and Control (I&C) System Modernizations Level 1 Level 3 Level 1 Level 3 Level 2 Level 2 All Reactor Types 12/14/2021 3002020579
MTA-OP-002 Operations Improve Efficiencies Using Unmanned Ground Systems for General Plant Use Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 09/30/2023 N/A
MTA-RP-005 Radiation Protection Reduce Dose and Increase Efficiency Using Unmanned Ground Systems for Radiation Protection Tasks Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 09/30/2023 N/A
MTA-EN-010 Engineering Reduce Plant Personnel Burden by Using Camera-Based Analog Gauge Position Readers Level 3 Level 1 Level 3 Level 3 Level 3 Level 2 All Reactor Types 12/14/2021 N/A
MTA-EN-011 Engineering Implementation of Sensors for Post-Tensioned Tendons Level 3 Level 1 Level 1 Level 3 Level 3 Level 3 Reactors with post-tensioned containments 12/14/2021 3002021026
MTA-EN-012 Engineering Improving Implementation of Digital Upgrades by Adopting EPRI’s Digital Engineering Guide Level 3 Level 0 Level 0 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 N/A
MTA-MA-006-R1 Maintenance Reduce Inspection Costs for Reactor Internals by Utilizing Automated Tooling and Remote Operated Vehicles (ROVs) Level 2 Level 2 Level 3 Level 3 Level 3 Level 3 BWRs and PWRs 12/14/2021 N/A
MTA-MA-007 Maintenance Reduce Cost of Oil Analysis for Large Oil Reservoirs Using Online Oil Sensors Level 3 Level 1 Level 3 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 N/A
MTA-MA-008 Maintenance Reduce Heat Exchanger Maintenance Costs through Online Monitoring Level 3 Level 1 Level 1 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 3002028178
MTA-MA-009 Maintenance Reduce Pump Maintenance Costs through Online Monitoring Level 3 Level 1 Level 2 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 3002028178
MTA-MA-010 Maintenance Reduce Compressor Maintenance Costs through Online Monitoring Level 3 Level 1 Level 2 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 3002028178
MTA-MA-011 Maintenance Reduce Coupling Maintenance Costs through Online Monitoring Level 3 Level 1 Level 2 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 N/A
MTA-MA-012 Maintenance Reduce Main Condenser Maintenance and Inspection Costs and Improve Thermal Performance through Online Monitoring Level 3 Level 1 Level 2 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 N/A
MTA-MA-013 Maintenance Turbine-Generator Shaft Torsional Vibration Monitoring Using an RF-Powered Multi-Sensor Module Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-MA-014 Maintenance Reduce Air Handling Equipment Maintenance Costs through Online Monitoring Level 3 Level 1 Level 2 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 N/A
MTA-MA-015 Maintenance Increase Steam Generator Deposit Removal Capacity and Cost Savings Through Inhibited Advanced Scale Conditioning Agent (iASCA) and Consolidated Deposit Extraction (CODE) Treatment Level 2 Level 1 Level 2 Level 3 Level 3 Level 3 PWRs 12/15/2020 N/A
MTA-MA-016 Maintenance Reduce Scheduling Cost, Dose, and Waste in Inspection of Steam Generator Tubing Using an Enhanced Bobbin Eddy Current Coil Inspection Technique Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 PWRs 12/15/2020 N/A
MTA-MA-017 Maintenance Volumetric Inspections of Inaccessible Buried Piping via Robotic Crawler Level 3 Level 2 Level 3 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-MA-018 Maintenance Reduce Large Heat Exchanger Replacement Costs Using Modified Crawler Vehicle Level 3 Level 2 Level 3 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-MA-019 Maintenance Extend Calibration Intervals Using Historical Calibration Data Level 2 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-MA-020-R1 Maintenance Reducing Condenser Inspection Costs Using Unmanned Aerial Vehicles (UAV) Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 03/01/2023 N/A
MTA-MA-021-R1 Maintenance Reducing Costs Using Unmanned Aerial Vehicles (UAV) for Containment Inspections Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 03/01/2023 3002021027
MTA-MA-022 Maintenance Improve Online Equipment Condition Monitoring using Electrical Signature Analysis (ESA) Level 2 Level 0 Level 0 Level 3 Level 2 Level 3 All Reactor Types 12/15/2020 3002021027
MTA-CY-001 Chemistry & Environmental Reduce Steam Generator Deposit Fouling Using Polymeric Dispersant Level 3 Level 2 Level 1 Level 3 Level 3 Level 3 PWRs 12/15/2020 N/A
MTA-EN-005 Engineering Improve Equipment Reliability and Performance by Implementing a Digital Turbine Control System Upgrade Level 1 Level 2 Level 1 Level 3 Level 3 Level 2 All Reactor Types 04/23/2021 N/A
MTA-EN-013 Engineering Improving Reliability Through Digital Feedwater Level Control Level 1 Level 2 Level 2 Level 3 Level 3 Level 2 All Reactor Types 12/14/2021 N/A
MTA-EN-014 Engineering Improving Reliability Through Digital Feedwater Heater Level Control Level 1 Level 2 Level 2 Level 3 Level 3 Level 2 All Reactor Types N/A
MTA-NF-001 Nuclear Fuels Reduce Fuel Cost by Utilizing an Optimum Time-Cost-of-Money Coastdown Strategy Level 3 Level 2 Level 3 Level 3 Level 3 Level 3 LWRs 12/15/2020 N/A
MTA-NF-004 Nuclear Fuels Increase Fuel Reliability, Performance, and Safety Combined with Lower Fuel Costs by using Accident Tolerant Fuel with Higher Enrichment and Burnup Level 2 Level 2 Level 3 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-NF-005 Nuclear Fuels Improving Moisture Carryover Predictions Using a Neural Network Model Level 3 Level 2 Level 3 Level 3 Level 3 Level 3 BWRs 12/15/2020 N/A
MTA-NF-006 Nuclear Fuels Reduce Fuel-Related Operating Costs Through Statistics-Driven Innovations Level 3 Level 2 Level 2 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-OP-001 Operations Improve Efficiencies with Digital Plant Viewer Software Application Level 2 Level 2 Level 2 Level 3 Level 3 Level 2 All Reactor Types 12/14/2021 N/A
MTA-OP-002 Operations Improve Efficiencies Using Unmanned Ground Systems for General Plant Use Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 09/30/2023 N/A
MTA-PRA-001 Probabalistic Risk Analysis Increase Operational Flexibility of Pressure Boundary Components Using an Enhanced Risk-Informed Categorization Methodology Level 3 Level 0 Level 0 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-PRA-002 Probabalistic Risk Analysis Extending Technical Specification Completion Times via Risk Managed Technical Specifications (RMTS) Level 2 Level 2 Level 0 Level 1 Level 3 Level 3 BWRs and PWRs in the United States and other countries that adopt similar guidance as NEI 06-09, Rev 0A and TSTF-505, Revision 2. 02/01/2025 N/A
MTA-SC-001 Supply Chain Increase Cost Savings and Implement Savings Trending Using Enhanced Prioritization and Reporting Smart Applications (PE PRO and QRI Tracker) Level 3 Level 2 Level 3 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-SC-002 Supply Chain Decreased Lost Generation Time by Improving Equipment Reliability through a Parts Quality Initiative Program Level 3 Level 2 Level 2 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-WM-001 Work Management Reduce Operating Costs using Electronic Work Packages (eWPs) for Maintenance Work Level 2 Level 2 Level 2 Level 3 Level 3 Level 3 All Reactor Types 07/15/2021 3002019843
MTA-WM-002 Work Management Reduce Dose and Labor Hours using Digital Fuel Move Sheets (DFMS) Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 N/A
MTA-WM-003 Work Management Improve Contractor Management Efficiency and Reporting using an Automated Contractor Spend Management Solution Level 3 Level 1 Level 1 Level 3 Level 3 Level 3 All Reactor Types 03/01/2023 N/A
MTA-MA-005 Maintenance Enhance Equipment Monitoring and Troubleshooting Techniques Using a Mobile Wireless Performance Monitoring Cart Level 3 Level 1 Level 3 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 N/A
MTA-SY-001 Security Reduce O&M Costs Using Vehicle Search Mobile Application Level undefined Level 1 Level undefined Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 N/A
MTA-TR-001 Training Reduce Ultrasonic Testing (UT) Training and Examiner Proficiency Hands on Practice Costs using Virtual Nondestructive Evaluation Simulation Level 3 Level 1 Level 1 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 3002020581
MTA-TR-002 Training Improving Training Quality and Efficacy using Virtual Reality Technology Level 3 Level 1 Level 3 Level 3 Level 3 Level 2 All Reactor Types 12/14/2021 N/A
MTA-RP-001 Radiation Protection Risk-informed Condition Based Radiological Surveys Using Remote Radiation Monitoring Technologies Level 2 Level 1 Level 2 Level 3 Level 2 Level 2 All Reactor Types 12/15/2020 N/A
MTA-RP-002 Radiation Protection Reduce Dose Using Application-Specific, Prefabricated Lead Shielding Assembly Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-RP-003 Radiation Protection Reduce Dose and Labor Hours Using An Advanced Wearable Communication System Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-RP-004 Radiation Protection Remote Verification of Work Tasks to Reduce Plant Entries Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 N/A
MTA-RP-005 Radiation Protection Reduce Dose and Increase Efficiency Using Unmanned Ground Systems for Radiation Protection Tasks Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 09/30/2023 N/A
MTA-NF-002 Nuclear Fuels Reduce Risk of Baffle Jetting by Modifying Core Coolant Flow Path Level 1 Level 1 Level 1 Level 3 Level 3 Level 3 WEC plants with downward flow between baffle plates and core barrel 12/15/2020 N/A
MTA-NF-003 Nuclear Fuels Increase Safety and Reduce Rechannels Through the Use of Advanced Materials in BWR Fuel Channels Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 BWRs 12/15/2020 N/A
MTA-MA-029 Maintenance Reduce Inspection Cost for Isophase Bus Duct Using Robotic Crawler Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 N/A
MTA-MA-030 Maintenance Safety Improvement and Cost Savings for Underwater Inspections by Using Submersible Drones Level 3 Level 1 Level 3 Level 3 Level 3 Level 2 All Reactor Types 12/14/2021 N/A
MTA-MA-031 Maintenance Reducing Labor Cost and Dose in the Qualification and Installation of Non-welded Fittings in both Safety (SR)and Non-Safety Related (NSR) Applications Level 3 Level 1 Level undefined Level 2 Level 3 Level 3 All Reactor Types 02/01/2025 N/A
MTA-MA-023 Maintenance Reduce Maintenance Costs and Improve Plant Reliability by Implementing a Full Solid State Protection System (SSPS) Replacement Level 1 Level 1 Level 1 Level 3 Level 3 Level 2 WEC PWRs with SSPS or Relay Protection System 12/15/2020 N/A
MTA-MA-024 Maintenance Reduce Long-Term Plant Equipment Component Engineering and Maintenance Costs Using Wireless Vibration Sensors Level 3 Level 1 Level 3 Level 3 Level 3 Level 2 All Reactor Types 04/23/2021 3002028178
3002020885
MTA-MA-025 Maintenance Reduce Maintenance Costs and Time at Reduced Power by Extending the Maintenance and Test Intervals for Turbine Valves and the Turbine Overspeed Protection System (OPS) Using an Enhanced Turbine Missile Probability Model Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 04/23/2021 3002020580
MTA-MA-026 Maintenance Reduce Maintenance and Testing Using Hydrophobic Coatings for Emergency Service Water Pumps Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 07/15/2021 3002018426
MTA-MA-027 Maintenance Reduce Piping Inspection Costs and Worker Exposure through Risk-Informed In-Service Inspection Methodology Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 3002020582
MTA-MA-028 Maintenance Reduce Inspection Costs Using an Internal Unmanned Aerial System (UAS) Program Level 3 Level 0 Level 0 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 N/A
MTA-EN-015 Engineering Automatic Identification and Quantification of Simultaneous Faults through Digital Twin Fault Inference Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 02/01/2025 N/A
MTA-FD-001-R1 Fire Department Reduce Manual Compensatory Fire Watch Costs Using Mobile Fire Watch Carts Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 All Reactor Types 04/23/2021 N/A
MTA-IT-001 Information Technology Reduce Administrative Overhead through Process Automation using Machine Learning and Artificial Intelligence Level 3 Level 1 Level 2 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 N/A
MTA-LS-001 Licensing and Regulatory Affairs Reduce BWR Core Shroud Inspection Costs Using a Novel Ultrasonic Technique Able to Detect Off-Axis Flaws Level 3 Level 1 Level 3 Level 3 Level 3 Level 3 Most BWR 3/4/5 Configurations 12/15/2020 N/A
MTA-MA-001 Maintenance Gas Void Detection via Wireless Ultrasonic Monitoring Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 N/A
MTA-MA-002 Maintenance Reduce Motor Maintenance Costs Through On-Line Monitoring Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 12/15/2020 3002028178
3002020885
MTA-MA-003 Maintenance Implement Wireless Network Infrastructure Using a Distributed Antenna System (DAS) Level 2 Level 0 Level 0 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 N/A
MTA-MA-004 Maintenance Implement Wireless Network Infrastructure Using WiFi Level 1 Level 0 Level 0 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 N/A
MTA-EN-006-R1 Engineering Increase Core Thermal Power by Reducing Uncertainty through Data Validation and Reconciliation Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 3002019845
MTA-EN-007 Engineering Improved Thermal Performance Through Cycle Isolation Monitoring Level 3 Level 1 Level 2 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 3002019844
MTA-EN-008 Engineering Reduce Dose and Maintenance Costs of Flow-Accelerated Corrosion Piping Inspections using Structural Health Monitoring Ultrasonic Sensors Level 3 Level 1 Level 1 Level 3 Level 3 Level 3 All Reactor Types 12/14/2021 3002018480
MTA-EN-001 Engineering Reduce Maintenance Costs Using Wireless Gauge Readers Level 3 Level 1 Level 2 Level 3 Level 3 Level 2 All Reactor Types 12/15/2020 N/A
MTA-EN-002 Engineering Reduce Dose and Maintenance Costs of Heat Exchanger Shells Using Structural Health Monitoring Guided Wave Sensors Level 3 Level 1 Level 1 Level 3 Level 2 Level 2 All Reactor Types 12/15/2020 3002018481
MTA-EN-004 Engineering Increase Control Element Drive Mechanism (CEDM) Lifespan and Reliability Through High-Temperature CEDM Gripper Coil Level 2 Level 1 Level 1 Level 3 Level 3 Level 3 Combustion Engineering (CE) reactors 04/23/2021 N/A

SWEEP Score

SWEEP Score Key Description Level 0 Level 1 Level 2 Level 3
Cost The estimated cost to implement the technology. It is assumed that existing enablers are installed and utilized as required. N/A Implementation cost is greater than USD 5M. Implementation cost is greater than USD 1M but less than USD 5M (inclusive). Implementation cost is less than USD 1M (inclusive).
Savings The estimated savings with priority given to measurable savings over the savings gained by event avoidance. Savings are not evaluated because the technology or process improvement is an enabler. Savings are less than USD 1M per year (inclusive). Savings are greater than USD 1M per year but less than USD 5M per year (inclusive). Savings are greater than USD 5M per year.
Payback Evaluating the cost of implementation against savings assists in estimating the return on investment if the technology is implemented. No identified payback period because either the savings were achieved by event avoidance or the technology or process improvement is an enabler. Payback period is greater than five years. Payback period is greater than one year but less than five years (inclusive). Payback period is less than one year (inclusive).
Implementation Proficiency Many of the technologies that could be leveraged by plant modernization require the use of digital components. This means that a site should have a level of maturity to implement each of the technologies. The technology should be implemented by sites that are considered centers of digital excellence. The technology should be implemented by sites that specialize in digital integration. The technology should be implemented by sites that use a Systems Engineering process when integrating digital technology. The technology can be implemented by all sites regardless of digital experience.
Licensing Readiness This licensing readiness level is an estimate of the level of effort that is required to allow the implementation of the technology from a regulatory standpoint (US). National law changes are required for implementation. Regulatory changes are required for implementation. Regulatory guidance changes are recommended for implementation. No changes are required for implementation.
Technical Readiness The technical readiness level (TRL) is based on the formal nine-level taxonomy model developed by NASA. The purpose of the TRL is to estimate what has been achieved for a given technology and to track its development. The technology is a concept only The technology is ready for detailed design and development. The technology is ready for pilot deployment. The technology is ready for wide operational deployment.